Replacement of water supply network in Port Gdańsk – project documentation

This project involves carrying out construction work in order to replace the existing PE piping system for new ones, with the same diameter but higher operating parameters: the new PE pipes will have thicker walls which allows for higher operating pressure which, as a result, will limit the number of failures that currently are too common. All water supply fittings are also going to be replaced as part of the investment.

 

Additionally, a water access point for fire prevention will be created on WOC II Quay that will increase fire safety for the whole facilities located on the quay. The new water access point will enable water abstraction for fire prevention with no less than 20 dm3/s at the minimum water level in accordance with applicable provisions of law.