Przebudowa kanalizacji deszczowej i zaolejonej dla EDF Kraków

The project involved the preparation of the concept and executive design of the existing storm drain and oily water drainage system together with the delivery of an oil separator, a DAF unit and new pumps for the existing wastewater pumping station. The project was preceded by a survey and wastewater analysis in order to select the optimal pretreatment method.
Pretreated wastewater is going to be reused internally for cooling purposes.