Preparing design documentation for dewatering of regional road No. 222 in Jabłonowo from km 48+400 to km 48+670

The project aimed at designing dewatering and pretreating system for precipitation water collected from the road. The new system should not interfere with the already-existing road construction and fiber-optic cables.

 

The job included:
1. Preparing design documentation, obtaining all necessary permits, opinions and decision required by law and filing for a construction permit on behalf of the Client,
2. Preparing answers to questions posed in the proceeding for granting a public procurement for the job,
3. Exercising project architect’s supervision using the time of the development work, hereinafter referred to as “Supervision” (See chapter V), following the carried out project documentation;